EUROLOGIC MAN-FC2000-RAID Podręcznik Użytkownika Strona 63

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 90
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 62
Installing and Removing an I/O Module or RAID Controller
63
Installing and Removing an I/O Module or RAID
Controller
The I/O module or RAID controller is located in the rear
of the enclosure. Follow these procedures to install and
remove the I/O module or RAID controller.
Installing an I/O
Module or RAID
Controller
1 Remove the blank if there is one installed.
2 Gently insert the I/O module or RAID controller into the slot.
3 Secure in place using the two fixing screws (torque setting
0.3Nm).
4 Connect the cables as described in Chapter 3.
Removing an I/O
Module or RAID
Controller
1 Remove all cables.
2 Loosen the two fixing screws.
3 Using the module handle, gently slide the I/O Module or RAID
Controller out of the slot.
CAUTION: Immediately replace the carrier or install a blank to
maintain correct airflow.
Figure 5-5 I/O Module and RAID Controller
DB9
Host connector
HSSDC
Disk/Enclosure
Expansion
LEDs
Serial
RS232
Port
RAID
Controller
I/O Module
Przeglądanie stron 62
1 2 ... 58 59 60 61 62 63 64 65 66 67 68 ... 89 90

Komentarze do niniejszej Instrukcji

Brak uwag